Really happy how this home remodeling in Chevy Chase, MD turned out. The main goal of this project was to open up the floor plan and remove load-bearing walls. So, we ended up installing 26’ long double lvl with staggered steel plates on the inside per the engineer’s design. New hardwood flooring as well as complete kitchen makeover 😍
Swipe 👉 to see pictures before and after.